PNCI Construction provided new offices, bathrooms with new locker rooms, conference rooms with updated IT/AV equipment, a new laboratory, paint and flooring throughout including a security system for the existing facility. The new construction of a maintenances shop with wash bay also included 2,600 sf of office space. A chemical storage building, fully protected with a gas detection system, was built on the re-developed eight-acre site including new utilities, both buildings being fully sprinkle, area drainage, a detention pond, fleet and equipment parking and landscaping.
Basic Energy (Formerly Maverick Stimulation)
![New Build Gymnasium](https://8ccbd2.p3cdn1.secureserver.net/wp-content/uploads/2016/02/Maverick-West-82811-005-640x400.jpg)